MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday., This news data comes from:http://vetgljyj.705-888.com
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.

Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
- ₱1.7M shabu seized in Taguig buy-bust
- Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam
- DPWH exec fired, 2 others face dismissal over flood control mess
- China is showing off its weaponry in a tightly controlled military parade
- Ever dream of having an entry in the Guinness World Records? Here's how to do it
- Ukraine eyes defense deal with PH that includes co-production of drones, says envoy
- Pag-IBIG Fund gives occupants 10% discount to legally buy acquired homes
- Immigration: 1st lookout bulletin in effect on 35 individuals, including Discayas, linked to anomalous flood control projects
- South Korean President vows support to Koreans arrested in US immigration raid
- Marcos says commission on DPWH anomalies to be finalized 'very soon,' mum on Magalong participation